Monday, March 17, 2014

FINAL FINISHING


FINAL FINISHING......

living room ceiling fixtures.......edison bulbs will be added.

Anticipation is building.....well...at least mine is...as we head into the final stretch of finishing up this renovation project.  Some of the remaining light fixtures which were on back order arrived and were installed.   The bathroom vanity tops, plumbing fixtures  and toilet room accessories have been installed. 
first floor bathroom
The interior stair has been stained and the wall hung handrail installed.  We used a stained oak tread with a painted riser.  At the base of the first floor stair run, a metal and wood capped handrail will be installed to finish this off.  



 
Glass / metal kitchen wall cabinets create a visual contrast and to the wood base cabinets and provide additional storage.  Stainless appliances arrived this week and have been installed. White subway tile is used for the backsplash creating a clean backdrop.   White corian type counters will go in this week.  Painting of the wall mounted open storage shelves will complete the kitchen.  

kitchen backsplash with subway tile
This week the outside projects will be completed -- siding, stucco, trim and concrete pavers.  We will do some interior staging this week and schedule the photographer.


This renovated Portage Park single family home with 5 bedrooms and 3 bathrooms will be on the mls and  ready for viewing by the end of next week.....I think it might be warm by then.....please spread the word to anyone who might be interested.